New construction of recycling plant, Hinwil
The project
Location: Hinwil (ZH)
Customer: Keller Recycling AG
Phases: Soil investigation, clarification of groundwater conditions, material replacement concept
Duration: 2020
A new recycling plant is planned for the site. Ecosens AG investigated the geological and hydrogeological conditions by means of core drillings, SPT tests and pumping tests. A subsoil model with a detailed description of the geological layers was created. In addition, construction recommendations were given for the foundation and excavation pit design. In addition, pumping tests were evaluated to determine the permeability of the aquifer. As part of a material replacement concept, calculations were carried out to maintain the natural flow capacity of the subsoil.
We look forward to continuing to manage exciting projects for you at Hammerweg.
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkPrivacy policy