Customer: Federal Roads Office FEDRO Zofingen branch
Phases: Realization and commissioning
Duration: 2023 - 2025
A 6-lane expansion is planned on the N01 between Aarau Ost and Baden West over a length of 14.6 km. The project is part of the Strategic Development Program (STEP) for the further development of the national road network. Construction is currently expected to start as early as 2031 and take around six years. Extensive structural modifications to existing engineering structures are already being carried out in preparation.
The N01-308 overpass in Lenzburg comprises a highly frequented SBB bridge on the Zurich - Bern railroad line and a road overpass. The existing bridge piers were replaced with reinforced concrete walls and all bridge bearings were also replaced. As part of the project planning, Ecosens AG carried out various material investigations and sampling under traffic conditions. During the subsequent construction phase, Ecosens was commissioned with the environmental construction supervision (UBB). The project was realized under traffic conditions from February to December 2024 and thus lasted around one year.
Planning and implementation of advance excavator soundings and sampling of soil, excavated material, asphalt and building substance, waste classification of construction waste with disposal specifications
Environmental instruction of the contractor, review and approval of contractor concepts such as machine list, construction site drainage concept and disposal concept
Planning and implementation of environmental construction site inspections, monitoring of environmentally compliant construction work
Advising clients and contractors on environmental issues, carrying out environmental clarifications and sampling during construction (suspected asbestos)
Documentation of the environmental construction site inspections carried out and the environmental measures implemented in the environmental construction journal
Challenges
High demands on construction site logistics due to very tight space conditions on the highway construction site
Project realization with traffic on the national road and the Zurich - Berne SBB line with very high traffic load on rail and road
High deadline pressure due to specified deadlines for load redistribution when replacing the new bridge bearings on three structural axes