As part of the construction of a residential development on a former industrial site, a culverted stream was cleared over a length of around 100 m and renaturalized. The new course of the stream was almost at the same location as the culvert, which placed demanding requirements on the relocation. A bridge and a new discharge structure were built in the project area. The construction project on a contaminated site was supervised and monitored by Ecosens AG.