«Dam renovation Full», Full - Reuenthal (AG)

Environment / Soil Protection Specialist

The project

As part of a periodic safety inspection of the dam along the Rhine in the municipality of Full-Reuenthal (AG) in 2017, it was determined that the stability of the relevant dam cross-section could not be proven. Further investigations into statics and stability were carried out to determine possible measures to restore the safety requirements and to renovate the dam, and a project dossier was drawn up. Ecosens AG supported the client as an environmental specialist as part of the project planning and with regard to the planning approval procedure by the Swiss Federal Offices for the Environment (FOEN) and for Energy (SFOE). As part of the planning application dossier, Ecosens drew up an environmental note and a soil protection concept. In the environmental note, an environmental relevance analysis was carried out and the effects in the construction and operational phases were identified for the relevant environmental aspects and environmental measures were proposed where necessary. The soil protection concept characterized the soils affected by the construction work and proposed measures to protect the soil during construction. Construction is scheduled to begin in summer 2026.

Info about the project

Contact person

Sandra Laubis

Head of Environment & Planning

Lars Schudel

Senior Project Manager Contaminated Sites, Deputy Head of Environment & Planning